| Characteristic | Capacity in gigawatts |
|---|---|
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
The chart is not accessible to screen readers. Please switch to the table view to access the data.
Download
Source
Release date
March 2023
Region
United States
Survey time period
2010 to 2022
Special properties
Data excludes battery capacity from hybrid projects.
Supplementary notes
According to the source, interconnection queue data through the end of 2022 was compiled for seven independent system operators (ISOs) and 35 utilities, serving about 85 percent of all U.S. electricity load.
Only includes "active" projects in interconnection queues. Excludes projects listed as "online", "withdrawn", or "suspended".
Battery storage and all hybrid categories data is from 2018 through 2022.
ERCOT queue data includes only projects that have requested a full interconnection study (FIS).
Figures have been rounded.