| Characteristic | Noncoincident winter peak load in megawatts |
|---|---|
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
The chart is not accessible to screen readers. Please switch to the table view to access the data.
Download
Source
Release date
March 2017
Region
United States
Survey time period
1990/00 to 2015/16
Supplementary notes
The winter peak period is December through February of the following year. Noncoincident peak load is the sum of two or more peak loads on individual systems that do not occur at the same time interval. Totals may not equal sum of components because of independent rounding.
Data include the U.S. portion of NERC only.
* The abbreviation ERCOT stands for Electric Reliability Council of Texas. It was named TRE (Texas Regional Entity) in 2007.
** This figure represents a forecast.
Citation formats