In 2024, the floor area of factory construction starts in Japan reached **** million square meters. The figure peaked in 2018, with the floor space of new factory construction projects amounting to over ** million square meters.
Profit from the additional features of your individual account
Currently, you are using a shared account. To use individual functions (e.g., mark statistics as favourites, set
statistic alerts) please log in with your personal account.
If you are an admin, please authenticate by logging in again.
Learn more about how ÌÇÐÄÆÆ½â°æ can support your business.
e-Stat (Japan). (January 31, 2025). Floor area of factory building construction starts in Japan from 2015 to 2024 (in million square meters) [Graph]. In ÌÇÐÄÆÆ½â°æ. Retrieved July 27, 2026, from /statistics/1274670/japan-floor-space-factory-construction-starts/
e-Stat (Japan). "Floor area of factory building construction starts in Japan from 2015 to 2024 (in million square meters)." Chart. January 31, 2025. ÌÇÐÄÆÆ½â°æ. Accessed July 27, 2026. /statistics/1274670/japan-floor-space-factory-construction-starts/
e-Stat (Japan). (2025). Floor area of factory building construction starts in Japan from 2015 to 2024 (in million square meters). ÌÇÐÄÆÆ½â°æ. ÌÇÐÄÆÆ½â°æ Inc.. Accessed: July 27, 2026. /statistics/1274670/japan-floor-space-factory-construction-starts/
e-Stat (Japan). "Floor Area of Factory Building Construction Starts in Japan from 2015 to 2024 (in Million Square Meters)." ÌÇÐÄÆÆ½â°æ, ÌÇÐÄÆÆ½â°æ Inc., 31 Jan 2025, /statistics/1274670/japan-floor-space-factory-construction-starts/
e-Stat (Japan), Floor area of factory building construction starts in Japan from 2015 to 2024 (in million square meters) ÌÇÐÄÆÆ½â°æ, /statistics/1274670/japan-floor-space-factory-construction-starts/ (last visited July 27, 2026)
Floor area of factory building construction starts in Japan from 2015 to 2024 (in million square meters) [Graph], e-Stat (Japan), January 31, 2025. [Online]. Available: /statistics/1274670/japan-floor-space-factory-construction-starts/