| Characteristic | Noncoincident summer peak load in megawatts |
|---|---|
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
| - | - |
The chart is not accessible to screen readers. Please switch to the table view to access the data.
Download
Source
Release date
March 2017
Region
United States
Survey time period
1990 to 2015
Supplementary notes
WECC was renamed from WSCC in 2002.
The summer peak period is June through September. Noncoincident peak load is the sum of two or more peak loads on individual systems that do not occur at the same time interval. Totals may not equal sum of components because of independent rounding.
The abbreviation WECC stands for Western Electricity Coordinating Council. WECC's territory extends from Canada to Mexico, including the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.
Data include the U.S. portion of NERC only.